Home > Tractor > Delivery Rake

Delivery Rake

December 6th, 2009 admin Leave a comment Go to comments

Delivery Rake

1996 Channel Tunnel Fire

Background

The train that caught fire was a HGV shuttle number 7539. It was made up of two locomotives (one at the front and one at the rear of the train, with the driver in the front one), an amenity coach carrying the truck drivers through the tunnel, and two rakes of HGV carrier wagons (a rake is a collection of unpowered rail vehicles of similar type and function, such as passenger coaches). The rakes contained a number of HGV carrier wagons (fourteen in the front rake, fifteen in the rear rake) plus flatbed wagons at each end of each rake to aid loading and unloading of the HGVs.

In total the train was approximately 800 metres long, with the driver in the front locomotive and all other persons (two crew and 31 passengers) inside the front coach. Twenty nine HGVs were being transported, one per wagon, behind the front flatbed wagon.

One HGV in the consist was placarded as carrying dangerous goods (polystyrene beads, UN 2211). It was located almost exactly half-way along the train. The other 28 trucks carried a variety of loads, some combustible, some inert. They included cornflakes, washing machines, glucose, titanium scrap, pineapples, paper and frozen fat.

Other trains were in the tunnel at the time of the incident. There were three trains ahead of train 7539, all of which drove out of the English portal as normal. Two trains entered the tunnel behind the incident train: a lone locomotive directly behind train 7539 (from which the driver evacuated to the service tunnel) and a Eurostar passenger train behind that (which reversed out through the French portal).

There were three trains in the opposite running tunnel, travelling from Britain to France, all of which were affected by the fire. Two of the trains were slightly affected by smoke as they passed through on their way to France, and one was instructed to stop in the tunnel near to the site of the fire in order to act as a rescue train. It stayed there for slightly less than one hour before those evacuated from the HGV shuttle were loaded onto it.

Safety features at the time of the fire

The Channel Tunnel and the trains that run through it are equipped with a series of safety features.

The three tubes are linked together and each link has some form of isolation. The escape cross-passages link all three tubes together but are fitted with fire doors that are normally closed. The two crossovers are equipped with sliding doors that can be opened to allow trains to pass from one tunnel to the other or closed to separate the two tracks. The doors are normally closed, although on the night of the fire the doors at both crossovers were open.

The two running tunnels are linked by pressure relief ducts. These are normally open, and are equipped with motorized butterfly valves that can be closed remotely.

The service tunnel is ventilated to keep it at a higher air pressure than the two running tunnels. This normal ventilation system (NVS) runs continuously and means that whenever a cross-passage door is opened, air will flow from the service tunnel into the running tunnel.

The running tunnels are usually ventilated by piston action of trains, but there is also a supplementary ventilation system (SVS), consisting of variable-pitch fans at Shakespeare Cliff and at Sangatte. These can be set to supply or extract, and together can move air in either direction along either or both running tunnels. The supplementary ventilation system does not usually run, but a controller can switch the fans on, then change the angle of the fan blades to have them extract or supply air.

The traction system is divided into sections of 1,500 metres in length, which can be remotely switched to isolate failed sections.

The tunnel has a network of firemains, one in each of the three tunnels, which are linked together at the cross-passages. There are hydrants at each cross-passage and at intervals of 125 metres in the running tunnels. The firemain is divided into sections by valves so that leaking sections can be isolated for repair.

Control of the tunnel is split into two types of control centre. The main Rail Control Centre (RCC) directs the rail traffic and operates the signalling, traction, pumping, lighting and ventilation. There are RCCs in both countries, although only one is in charge at any one time.

Each country has a Fire Equipment Management Centre (FEMC) which looks after all fire hazards and fire alarms in the terminal and in the tunnels. Each FEMC controls equipment in its adjacent terminal and a portion of the tunnel, and is home to a small works fire brigade dedicated to the tunnel. Main firefighting effort is provided by the fire brigades of Kent and Pas-de-Calais.

Fire detectors are located at intervals of 1.7 kilometres along the length of the tunnel. These consist of a series of different types of detector: optical, ionic and carbon monoxide. The system is set such that if any two go off together, it raises a confirmed alarm in the FEMC and RCC. If only one of the three goes off, it raises an unconfirmed alarm in the FEMC.

The locomotives are all equipped with halon gas fire suppression systems, as are the car transporters wagons. The HGV wagons are different: they are open to the tunnel. The amenity coach (where the truck drivers sit out the journey) has the same half-hour fire protection as the Eurostar carriages.

The tunnel is not equipped with an emergency station with water fire suppression (unlike the Seikan Tunnel, the Ltschberg Base Tunnel and the unfinished Gotthard Base Tunnel).

The tunnels are mostly lined with segments of extremely high strength concrete but are not protected against spalling, which occurred here and reduced the concrete to a thickness of 50 millimetres. Common countermeasures against fire-caused damage to tunnel linings are described under fireproofing and fire-resistance rating.

Timeline

Train 7539 left the French terminal at 21:42 CET. It stopped for a short time at a red signal before entering the tunnel at 21:48.

At 21:47, four French security guards (one pair in a building, two others on patrol) noticed a fire in the tractor unit of an HGV approximately three-quarters of the way down the train. They estimated the flames to be about 2 metres high.

As the train passed through the first few kilometres of tunnel, unconfirmed fire alarms were triggered each time it passed a fire detector.

At 21:51, the Rail Control Centre called the driver of train 7539 to inform him that there was a possibility that his train had a fire on board. He was told to continue through the tunnel, and that his train would be diverted to the emergency siding when he emerged into the open air at the UK side, at which point Kent fire brigade could attend to it.

At 21:52, a second train (consisting of a single locomotive) entered the tunnel behind train 7539. A few kilometres in, the driver encountered smoke thick enough to make him slow down. At the same time, one of the fixed smoke detector units in the tunnel triggered a confirmed alarm, indicating to the Rail Control Centre that there was definitely smoke in the tunnel.

In response to the confirmed alarm, the Rail Control Centre began to prepare for a fire in the tunnel, in case train 7539 did not make it to the other end. To that end, the control centre:

Ordered all trains to slow to 100 kilometres per hour;

Closed all of the butterfly valves in the pressure relief ducts (PRDs);

Ordered the sliding doors at the UK crossover and French crossover to close;

Switched on the lighting in the service tunnel and in the UK-bound running tunnel;

Mobilised the works fire brigade at the French and British sides, who both set off for the midpoint of the service tunnel.

The RCC’s actions were intended to isolate the two running tunnels from one another but were not completely successful. One PRD remained open, and the French crossover door did not close completely.

Shortly after train 7539 passed the French crossover, a safety system on the train issued a ‘Stop’ message to the driver. An alarm indicated that one of the propping loops on a wagon had failed, allowing a jack to drop out of its stowed position. The jacks are lowered to stabilize the train during loading and unloading but are raised when the train is moving, to reduce the risk of derailment if there is debris next to the track.

The driver followed Eurotunnel’s standard procedure for the failure of a propping loop: he brought the train to a controlled halt, stopping it with the amenity coach next to one of the escape cross-passages. The train came to rest in the tunnel at 21:58.

The driver intended to uncouple the front locomotive and the amenity coach, then drive out of the tunnel leaving the fire and the HGV wagons behind. However, a few seconds after stopping, the traction power supply tripped out, stranding the train. The failure was later attributed to heating of a soldered connection in the traction power system.

When it stopped, the train was in French territory, approximately 19 km from the French portal, 32 km from the UK portal and 2 km west of the French crossover. The train spanned three cross-passages: the west cross-passage (CP4131) was next to the amenity coach; middle cross-passage (CP 4163) was next to the HGV carrying polystyrene; and the east cross-passage (CP4201) was next to the rearmost HGV.

The fire was on an HGV in the rear rake, close to CP 4201, either in the seventh HGV (carrying corn flakes) or the tenth HGV (carrying reels of paper). The fire was approximately 600 metres from the front of the train, but the forward flow of air over the stopped train carried the smoke to the front and filled the tunnel ahead of the train.

As the air in the tunnel around the locomotive was filled with smoke from the fire, the driver could not see the number of the cross-passage he had stopped at. The Rail Control Centre was aware that he had stopped with the amenity coach next to one of two cross-passages (CP4101 or CP4131) but did not know which.

At 22:02, the Channel Tunnel’s French works fire brigade entered the service tunnel with seven firefighters. The Rail Control Centre acted on the belief that the front of the train was next to cross-passage 4101, and directed the French firefighters to that cross-passage. At 22:03, the British works brigade entered the service tunnel as well.

At 22:05, the emergency services of Pas de Calais were alerted and instructed to attend an incident in the tunnel and take command of the event. One of the French commander’s first acts was to ask that the tunnel’s supplementary ventilation system (SVS) be operated. At 22:12, the Rail Control Centre started both SVS fans but the fan blades were left at zero pitch angle and had no effect on the direction of airflow in the tunnel. Air continued to flow forwards over the train, bringing smoke from the fire towards the amenity coach. Fortunately, the fire was sufficiently far back (600 m) that there was no significant heat coming forward.

While the French works brigade were on their way to cross-passage 4101, the air quality on the train deteriorated and those aboard became increasingly concerned about their safety. The driver was unable to leave the locomotive, even with his emergency breathing apparatus on: the train crew inside the amenity coach were unable to contact the driver due to a failure of the radio system. No one inside the amenity coach could see the adjacent cross-passage due to the smoke in the tunnel, and smoke was slowly coming into the amenity coach through small openings in the bodywork.

At approximately 22:05, the Chef de Train in the amenity coach opened one of the train doors to check if he could see the adjacent cross-passage. He could not, despite it being directly opposite the door, and although the door was open only for a short time, it allowed a large amount of smoke to get into the amenity coach. Passengers and crew began to breathe through cloths and to take air from floor level, beneath the layer of smoke in the carriage.

While waiting for the French works fire brigade to reach the scene, the Rail Control Centre spent some time arranging evacuation of the driver of the locomotive behind train 7539. The Centre also reconfigured the traction supply to allow the train behind the locomotive to reverse out. In addition, one of the Eurostar trains bound for France was brought to rest in the north running tunnel close to the site of train 7539, so that it could act as a rescue train if it was required.

At 22:21, the Rail Control Centre remotely opened the cross-passage doors at 4101 (where the amenity coach was believed to be) and at cross-passage 4131 (where it actually was). Clean air from the service tunnel began to flow into the running tunnel through both cross-passages.

When the French firefighters arrived at cross-passage 4101, they found an open cross-passage but no train. The sub-officer noted that the supplementary ventilation system appeared to be doing nothing, and requested a check on whether it was operating correctly. The Control Centre subsequently realized that the SVS fans were spinning but that the fan blades had been left at zero pitch. The SVS was configured correctly at 22:22 and finally created an air current that moved smoke from the fire away from the people on board train 7539.

When the Rail Control Centre opened the door in cross-passage 4131, clean air from the service tunnel blew out onto the side of the amenity coach. This cleared smoke locally and allowed the occupants of the amenity coach to see that they were right next to an open cross-passage. The staff in the amenity coach subsequently evacuated all the passengers into the service tunnel, where they spent the next few minutes coughing up the soot they had inhaled.

As the French works brigade made their way east along the service tunnel, they came across the evacuees near CP4131. They checked that the amenity coach was empty, and escorted the driver to safety. At 22:35, they closed the fire door in cross-passage 4131 and concentrated on assisting the worst-affected of the evacuees with oxygen. They were assisted by the works fire brigade from the British side, who arrived on the scene at 22:30.

Between 22:42 and 22:52, 27 walking wounded were loaded onto the rescue train waiting in the north running tunnel. The train set off towards France at 23:08 and despite passing through a cloud of smoke in the vicinity of the French crossover, left the tunnel without incident.

The other seven evacuees, who were more seriously affected, remained in the service tunnel and were taken to France in service tunnel vehicles equipped as ambulances.

Response

Firefighting

Having assured themselves that all aboard the train were now safe, the French and British works fire brigades began to investigate the fire. A crew of firefighters entered the tunnel near to the front of the train and began walking towards the French portal. They came close to the fire after walking approximately 500 metres, then turned back and reported that the seat of the fire was between the next two cross-passages (CP4163 and CP4201). Cross-passage 4131 was closed and all firefighting operations were moved east to the two cross-passages closest to the fire. Subsequently, Kent fire brigade began firefighting operations at cross-passage 4201 (downstream of the fire), and Pas-de-Calais fire brigade began firefighting operations at cross-passage 4163 (upstream of it). Overall control of the firefighting operation rested with Pas-de-Calais fire brigade.

For the next five hours, teams of firefighters from both countries attacked the fire from the two cross-passages. They worked in breathing apparatus, hampered by fallen cables, flapping rags of glass fibre from the tunnel cable tray and spalled concrete. Each shift of firefighters could work in the tunnel only for short periods of time before returning to the service tunnel.

The presence of hundreds of firefighters spread along half a kilometre of service tunnel caused huge logistical problems with supplies of BA sets, water and sanitation from both ends of the tunnel.

The water supply at the two cross-passages became significantly poorer when firefighting operations began, mostly due to leaking pipework in the south running tunnel. The number of jets was reduced to two until a Eurotunnel engineer reconfigured the valves to isolate the pipework between the two cross-passages. Once the section of pipe was isolated, water delivery improved substantially.

At 05:00 on 19 November 1996, the fire was declared extinguished. Most firefighters left the scene at 14:50 that day, although the debris continued to cool for another day or so.

Casualties and damage

No one was killed during the incident, and only minor injuries were sustained, all consisting of smoke inhalation by those people on the train. The oxygen therapy provided by the French works fire brigade at the scene proved an invaluable benefit: after observation in various hospitals, the last (and most seriously-affected) person was discharged the following night (19 November). The light casualties are attributed to the presence of the pressurized service tunnel and the oxygen provided at the scene.

Despite working in excessively hot and wet conditions, with spalling concrete falling from above, no firefighter suffered serious injury during the operation to extinguish the fire.

Along a 50-metre length of tunnel, the normally 0.4-metre thick tunnel lining was reduced to a mean depth of 0.17 metres, with the thinnest area being 0.02 metres. The chalk marl showed no signs of failing or collapsing, but colliery arches were subsequently installed to support the ground as a precaution.

Over a further 240-metre long section (70 metres towards Britain, 170 metres towards France), damage to the concrete extended as far back as the first set of reinforcement bars, reducing the linings to a depth of 0.20.35 metres. These segments were repaired in situ without additional ground support.

Superficial damage to the surface of the concrete segments was evident along a further 190 metres of tunnel length.

In the vicinity of the fire, all services were destroyed. This included high-voltage cables, low-voltages cables, communications, lighting systems, traction and junction boxes over a length of 800 metres.

Five hundred metres of track had to be replaced, as did 800 metres of catenary, 800 metres of refrigeration pipe, and signalling equipment over a length of 1500 metres. In all, four escape cross-passages and five pressure relief ducts had to be refitted with new doors and dampers.

The damage to the train was concentrated in the rear half. The front locomotive, amenity coach and front rake (including the truck carrying dangerous goods) suffered minor damage from heat and smoke: all were re-usable after thorough cleaning and minor repairs. The rear rake suffered major thermal damage: eleven wagons and the rear locomotive were scrapped, as were most of the HGVs being carried.

Consequences

Three separate investigations were conducted. The first was a French judicial inquiry into the cause of the fire, the second was an internal inquiry by Eurotunnel and the third was an inquiry by the Channel Tunnel Safety Authority (CTSA), a bi-national body formed of personnel from British and French railway safety bodies, fire brigades and government departments.

In the immediate aftermath of the fire, all train services were stopped. Three of the four types of train service were resumed in stages over the following two months. Refurbishment work in the tunnel at the site of the fire meant that when train services restarted, single-line working of the north tube was used between the two crossovers. The refurbishment was completed in May 1997, after which the HGV shuttle service was allowed to restart.

The fire showed significant weaknesses in Eurotunnel’s control procedures. The large number of duties carried out by the Rail Control Centre during the incident meant that some were not completed when they should have been. The CTSA’s criticisms were all the more pointed because this aspect had been noted during an internal Eurotunnel assessment of the Control Centre earlier in the year. Additional staff, one of whom is dedicated to managing fire alarms, are now permanently on duty. The procedures for operating the ventilation system have been simplified.

Eurotunnel’s policy of attempting to drive trains through the tunnel in the event of an on-board fire has been abandoned, as was the back-up policy of uncoupling the locomotive and amenity coach. In the future, trains will immediately be brought to a controlled stop and the occupants evacuated into the service tunnel under the direction of the Chef de Train.[citation needed] In addition, all HGV wagons have been fitted with water fog fire suppression systems, and the trains lengthened to provide more space between the first HGV and the amenity coach.

Liaison between Eurotunnel and emergency services has been entirely revamped. In addition, joint exercises and exchanges of personnel between the British and French fire brigades have been instituted, so that each has experience of the other’s operational procedures.

Various other minor changes have been made which will have a significant impact on the progress of events in a similar situation. The illumination of the cross-passage markers has been improved and staff on board the trains provided with powerful torches. Responsibility for evacuating the train has shifted from the driver to the Chef de Train, and more train staff are now required to have first aid training.

Sources

Allison, Roderick; Ryder, Edward; Caldwell, Sandra; Beech, Jeremy; Moss, Peter; Coleman, Victor; Lejuez, Roger; Barthelemy, Franois et al. (May 1997) (Report and recommendations), Inquiry into the fire on Heavy Goods Vehicle Shuttle 7539 on 18 November 1996, Channel Tunnel Safety Authority, ISBN 0115519319, http://www.railwaysarchive.co.uk/documents/CTSA_ChanTun1996.pdf 

First Sight: How safe is the tunnel?. BBC Television. January 1997. 

Welsh, W. (2001). “Channel Tunnel Fire (UK)” (contribution from Kent Fire Brigade to NEDIES project). Lessons Learnt from Tunnel Accidents. http://nedies.jrc.it/doc/tunnel Accidents_Final.pdf. 

Fudger, G. (March 1998). “Implications for Procedures in all Road and Rail Tunnels”. Seminar on Consequences of the Channel Tunnel Fire for all Road and Rail Tunnels. 

Bradbury, W. M. S. (March 1998). “The Channel Tunnel Fire: Design Implications for Other Tunnel Systems”. Seminar on Consequences of the Channel Tunnel Fire for all Road and Rail Tunnels. 

Kirkland, C. (2002). “The fire in the Channel Tunnel”. Tunnelling and Underground Space Technology vol. 17: pp.129-132. http://www.ita-aites.org/cms/fileadmin/filemounts/ovion/doc/safety/sydney/OS12.PDF. 

Liew, S. K.; Deaves, D.M,; Blyth, A.G. (1998). “Eurotunnel HGV fire on 18 November 1996 – Fire Development and Effects”. Proceedings of the 3rd International Conference on Safety in Road and Rail Tunnels. ITC. 

Comeau, E. (March/April 2002). “Chunnel Vision”. NFPA Journal. 

Comeau, E.; Wolf, A. (March/April 1997). “Fire in the Chunnel”. NFPA Journal. http://www.nfpa.org/assets/files/PDF/JournalChunnel.pdf?src=nfpa. 

French, S. C. (October 1994). “Fire Safety in the Channel Tunnel – An Overview”. Proceedings of the International Conference on Fires in Tunnels. Bors, Sweden. ISBN 91-7848-513-4. 

French, S. C. (October 1994). “Heavy Goods Vehicle Test for the Eurotunnel Project”. Proceedings of the International Conference on Fires in Tunnels. Bors, Sweden. ISBN 91-7848-513-4. 

Beech, J. (1990), Lecture to the Institution of Mechanical Engineers 

Kirkland, ed (1995). Engineering the Channel Tunnel. Chapman & Hall. ISBN 0-419-17920-8. 

v  d  e

Channel Tunnel

Construction

TransManche Link  LGV Nord  High Speed 1

Corporate

Eurotunnel Group  Eurostar (U.K.) Ltd.  SNCF  NMBS/SNCB

Passenger Services

Eurostar

Freight Services

Eurotunnel Shuttle  Europorte Channel

Other

Rail transport in France  Rail transport in the United Kingdom  1996 fire  2008 fire  2009 snow

fire portal

Coordinates: 5100 130 / 51N 1.5E / 51; 1.5

Categories: 1996 in France | 1996 in the United Kingdom | Channel Tunnel | Fires in England | Fires in France | Railway accidents in 1996 | Train and subway fires | 1996 firesHidden categories: Articles lacking in-text citations from September 2008 | All articles lacking in-text citations | All articles with unsourced statements | Articles with unsourced statements from March 2009
About the Author

I am Cheap On Sales writer, reports some information about cardinal bird feeder , weather vane rooster.

Side Delivery Rake

eBay Logo  

VINTAGE JOHN DEERE OPERATORS MANUAL-# 594  SIDE DELIVERY HAY RAKE


VINTAGE JOHN DEERE OPERATORS MANUAL-# 594 SIDE DELIVERY HAY RAKE


$13.49


McCORMICK #5 SIDE DELIVERY RAKE OPERATORS MANUAL & PARTS LIST


McCORMICK #5 SIDE DELIVERY RAKE OPERATORS MANUAL & PARTS LIST


$24.97


McCORMICK #11 PARALLEL BAR SIDE DELIVERY RAKE OPERATORS MANUAL


McCORMICK #11 PARALLEL BAR SIDE DELIVERY RAKE OPERATORS MANUAL


$18.97


McCORMICK #15 PARALLEL BAR SIDE DELIVERY RAKE OPERATORS MANUAL


McCORMICK #15 PARALLEL BAR SIDE DELIVERY RAKE OPERATORS MANUAL


$18.97


John Deere Operator's Manual Side Delivery Rakes No. 594 OM-E7-352


John Deere Operator’s Manual Side Delivery Rakes No. 594 OM-E7-352


$11.99


Case Side Delivery Rake 170 series Operators Manual


Case Side Delivery Rake 170 series Operators Manual


$7.99


Oliver Side Delivery Rake SLIK toy


Oliver Side Delivery Rake SLIK toy


$299.99


J.I. Case 170 Series Side Delivery Hay Rake


J.I. Case 170 Series Side Delivery Hay Rake


$5.00


John Deere 890 Side Delivery Rake Parts Manual


John Deere 890 Side Delivery Rake Parts Manual


$53.95


1951 New Idea Side Delivery Rake & Todder Farm ad


1951 New Idea Side Delivery Rake & Todder Farm ad


$6.50


John Deere Manual No. 594LW Side Delivery Rake OME15450


John Deere Manual No. 594LW Side Delivery Rake OME15450


$8.98


John Deere Operators Manual Semi-Integral Side Delivery Rake 851


John Deere Operators Manual Semi-Integral Side Delivery Rake 851


$8.98


John Deere Operators Manual 594LW Side Delivery Rake


John Deere Operators Manual 594LW Side Delivery Rake


$8.98


Vintage Operator's Manual John Deere No. 594LW Side Delivery Rake OM-E15-450


Vintage Operator’s Manual John Deere No. 594LW Side Delivery Rake OM-E15-450


$11.00


Oliver White Tractor No. 105 Side Delivery Rake Dealer's Parts Book


Oliver White Tractor No. 105 Side Delivery Rake Dealer’s Parts Book


$13.99


Oliver White Tractor No. 107 Side Delivery Rake Dealer's Parts Book


Oliver White Tractor No. 107 Side Delivery Rake Dealer’s Parts Book


$13.99


Oliver White Tractor No. 207 Side Delivery Rake Dealer's Parts Book


Oliver White Tractor No. 207 Side Delivery Rake Dealer’s Parts Book


$13.99


Sears D Bradley Side Delivery Hay Rake Set Up Operator Owners Manual Parts List


Sears D Bradley Side Delivery Hay Rake Set Up Operator Owners Manual Parts List


$19.95


IH McCormick Side Delivery Rake Setting Up Instructions Vintage Tractor Farm


IH McCormick Side Delivery Rake Setting Up Instructions Vintage Tractor Farm


$9.50


Side Delivery Rake - Farm Antique Postcard


Side Delivery Rake – Farm Antique Postcard


$9.95


REPAIR LIST SANDWICH-NEW IDEA 3 BAR #4,44,45-G,47 SIDE DELIVERY  RAKE & TEDDY


REPAIR LIST SANDWICH-NEW IDEA 3 BAR #4,44,45-G,47 SIDE DELIVERY RAKE & TEDDY


$9.99


ALLIS CHALMERS 3PT HITCH PTO DRIVER SIDE DELIVERY HAY RAKE


ALLIS CHALMERS 3PT HITCH PTO DRIVER SIDE DELIVERY HAY RAKE


$1,200.00


JOHN DEERE DEALERS PAMPHLETS ER SIDE DELIVERY RAKE FORAGE BLOWER FORAGE HARVEST


JOHN DEERE DEALERS PAMPHLETS ER SIDE DELIVERY RAKE FORAGE BLOWER FORAGE HARVEST


$12.00


Ferguson Parts Book For D-EO020 and 25 Side Delivery Rake


Ferguson Parts Book For D-EO020 and 25 Side Delivery Rake


$14.95


1948 CASE Model 168 169 Side Delivery Rake Parts Manual


1948 CASE Model 168 169 Side Delivery Rake Parts Manual


$24.00


John Deere No.594LW Side Delivery Rake Parts Manual


John Deere No.594LW Side Delivery Rake Parts Manual


$53.95


Massey-Ferguson MF 25 Side Delivery Rake Operator's Manual


Massey-Ferguson MF 25 Side Delivery Rake Operator’s Manual


$14.73


John Deere OM for 660. 670, 671 Side delivery rakes


John Deere OM for 660. 670, 671 Side delivery rakes


$19.99


Case F-170 Side Delivery Rake Operators Manual Part List


Case F-170 Side Delivery Rake Operators Manual Part List


$10.00


John Deere 54 Side-Delivery Rake Operator's Manual


John Deere 54 Side-Delivery Rake Operator’s Manual


$15.50


Ford Side Delivery Rake brochure, 1959, color, 4 pgs, NOS- perfect condition!


Ford Side Delivery Rake brochure, 1959, color, 4 pgs, NOS- perfect condition!


$1.98


Ford Series 508 Semi-Mounted Side Delivery Rake Owner's Operator's Manual


Ford Series 508 Semi-Mounted Side Delivery Rake Owner’s Operator’s Manual


$25.00


John Deere 662 672 673 Side Delivery Rake & Tandem Hitch ( - 915000) Ops Manual


John Deere 662 672 673 Side Delivery Rake & Tandem Hitch ( – 915000) Ops Manual


$4.99


1950 CASE 170 Side Delivery Rake Parts Manual -ORIG


1950 CASE 170 Side Delivery Rake Parts Manual -ORIG


$19.00


JOHN DEERE NO. 594 SIDE DELIVERY RAKE OPERATOR MANUAL


JOHN DEERE NO. 594 SIDE DELIVERY RAKE OPERATOR MANUAL


$9.99


Case 1937 155 - 175B Side Delivery Rake Parts Book


Case 1937 155 – 175B Side Delivery Rake Parts Book


$7.99


Case 100 Side Delivery Rake Manual Part List Catalog


Case 100 Side Delivery Rake Manual Part List Catalog


$15.00


NEW HOLLAND 90 SIDE-DELIVERY RAKE OPERATORS MANUAL


NEW HOLLAND 90 SIDE-DELIVERY RAKE OPERATORS MANUAL


$10.99


NEW HOLLAND F-36 SIDE DELIVERY RAKE PARTS MANUAL BOOK


NEW HOLLAND F-36 SIDE DELIVERY RAKE PARTS MANUAL BOOK


$10.99


1940s 1950s ALLIS-CHALMERS ALLIS CHALMERS SIDE DELIVERY RAKE OWNERS PARTS MANUAL


1940s 1950s ALLIS-CHALMERS ALLIS CHALMERS SIDE DELIVERY RAKE OWNERS PARTS MANUAL


$24.99


John Deere 670 671 Side Delivery Rake Operator Manual


John Deere 670 671 Side Delivery Rake Operator Manual


$7.99


Vintage 1960 Case 170 Series Side Delivery Rake Parts  Manual  have other models


Vintage 1960 Case 170 Series Side Delivery Rake Parts Manual have other models


$4.99


PÖTTINGER SIDE DELIVERY RAKE SALES SHEET


PÖTTINGER SIDE DELIVERY RAKE SALES SHEET


$3.15


1950 CASE Model F170 Side Delivery Rake Parts Manual


1950 CASE Model F170 Side Delivery Rake Parts Manual


$24.00


John Deere 662/672/673 Delivery Rake Operators Manual


John Deere 662/672/673 Delivery Rake Operators Manual


$40.95


dennings of chard side delivery rake & swath turner instructions & parts list


dennings of chard side delivery rake & swath turner instructions & parts list


$7.89


NEW IDEA 3 BAR, 4, 44, 45-G & 47 SIDE DELIVERY RAKE & TEDDER REPAIR MANUAL


NEW IDEA 3 BAR, 4, 44, 45-G & 47 SIDE DELIVERY RAKE & TEDDER REPAIR MANUAL


$12.00


KM064 Case 170 Series Side Delivery Rake Op Manual


KM064 Case 170 Series Side Delivery Rake Op Manual


$4.99


KM065 Case 170 Series Side Delivery Rake Op Manual


KM065 Case 170 Series Side Delivery Rake Op Manual


$4.99


J.I. Case 170 Series Side Delivery Rake Operators Manual


J.I. Case 170 Series Side Delivery Rake Operators Manual


$6.00


1955 ALLIS-CHALMERS ROTO-BALER SIDE DELIVERY RAKE TEDDER OWNERS SERVICE MANUAL


1955 ALLIS-CHALMERS ROTO-BALER SIDE DELIVERY RAKE TEDDER OWNERS SERVICE MANUAL


$19.99


John Deere 652 Side Delivery Rake ( -880000) Operator Manual E0


John Deere 652 Side Delivery Rake ( -880000) Operator Manual E0


$3.99


1965 Minneapolis Moline Side Delivery Rake Brochure


1965 Minneapolis Moline Side Delivery Rake Brochure


$14.20


John Deere 662 672 673 Side Delivery Rake & Hitch (915001-Up) Operator Manual B3


John Deere 662 672 673 Side Delivery Rake & Hitch (915001-Up) Operator Manual B3


$7.99


Oliver Antique Parts Book Manual Side Delivery Rake


Oliver Antique Parts Book Manual Side Delivery Rake


$22.99


John Deere 594 Side Delivery Rake Operator's Manual


John Deere 594 Side Delivery Rake Operator’s Manual


$11.99


New Holland 503 Side Delivery Rake Operators Manual


New Holland 503 Side Delivery Rake Operators Manual


$29.95


John Deere 652 Side Delivery Rake Operator's Manual


John Deere 652 Side Delivery Rake Operator’s Manual


$15.99


John Deere 662 Side Delivery Rake Operator's Manual


John Deere 662 Side Delivery Rake Operator’s Manual


$15.99


1940s John Deere Side Delivery Rake No 594LW Operators Manual


1940s John Deere Side Delivery Rake No 594LW Operators Manual


$9.99


1940s John Deere Side Delivery Rakes No 594 Operators Manual


1940s John Deere Side Delivery Rakes No 594 Operators Manual


$9.99


Owners/Operator Manual - John Deere 660, 670,& 671 Side Delivery Rakes


Owners/Operator Manual – John Deere 660, 670,& 671 Side Delivery Rakes


$25.00


John Deere 670/671 Delivery Rakes Operators Manual


John Deere 670/671 Delivery Rakes Operators Manual


$30.95


John Deere 553 594 Side Delivery Rake Parts Catalog Manual


John Deere 553 594 Side Delivery Rake Parts Catalog Manual


$4.99


1960 Ford 508 Semi Mounted Side Delivery Rake Manual h


1960 Ford 508 Semi Mounted Side Delivery Rake Manual h


$9.99


John Deere 670 671 Side Delivery Rake Parts Catalog Manual


John Deere 670 671 Side Delivery Rake Parts Catalog Manual


$7.99


John Deere 652 Side-Delivery Rake operator's manual


John Deere 652 Side-Delivery Rake operator’s manual


$7.99


Owners Manual Ford 508 Side Delivery Rake


Owners Manual Ford 508 Side Delivery Rake


$7.95


Massey Ferguson F-36 Side Delivery Rake Operators Parts Manual Lot


Massey Ferguson F-36 Side Delivery Rake Operators Parts Manual Lot


$24.99


Oliver No.2 Side Delivery Rake Operators Manual


Oliver No.2 Side Delivery Rake Operators Manual


$9.95


FORD 508 SM SIDE DELIVERY RAKE OPERATOR'S  MANUAL


FORD 508 SM SIDE DELIVERY RAKE OPERATOR’S MANUAL


$19.95


FORD 53 MOUNTED SIDE DELIVERY RAKE OPERATOR'S  MANUAL


FORD 53 MOUNTED SIDE DELIVERY RAKE OPERATOR’S MANUAL


$19.95


1956 Ford Side Delivery Rake Ford 850 Tractor Brochure


1956 Ford Side Delivery Rake Ford 850 Tractor Brochure


$14.99


JOHN DEERE #594 SIDE DELIVERY RAKES OPERATORS MANUAL


JOHN DEERE #594 SIDE DELIVERY RAKES OPERATORS MANUAL


$9.99


VINTAGE OLIVER  SETTING UP OPERATING  INSTRUCTIONS  SIDE DELIVERY RAKE 1957


VINTAGE OLIVER SETTING UP OPERATING INSTRUCTIONS SIDE DELIVERY RAKE 1957


$9.95


CASE 401 SIDE DELIVERY RAKE PARTS MANUAL


CASE 401 SIDE DELIVERY RAKE PARTS MANUAL


$19.95


1960's Massey-Ferguson Side Delivery Rakes Brochure,Nice


1960’s Massey-Ferguson Side Delivery Rakes Brochure,Nice


$12.50


McCormick Deering  Side Delivery Rake  Manual


McCormick Deering Side Delivery Rake Manual


$10.00


John Deere No. 851 Side Delivery Rake Operator's Manual


John Deere No. 851 Side Delivery Rake Operator’s Manual


$10.95


Allis Chalmers Model


Allis Chalmers Model “G” Tractor & Power-Driven Side Delivery Rake – 2 Postcards


$50.00


John Deere 890 side delivery wheel hay rake parts catalog manual book original


John Deere 890 side delivery wheel hay rake parts catalog manual book original


$14.50


John Deere 670 671 side delivery hay rake parts catalog manual book original


John Deere 670 671 side delivery hay rake parts catalog manual book original


$17.50


IH McCormick 4 Bar Side Delivery Rake Operators Manual


IH McCormick 4 Bar Side Delivery Rake Operators Manual


$9.32


Oliver No 2 Side Delivery Rake Parts Manual


Oliver No 2 Side Delivery Rake Parts Manual


$9.97


John Deere 650 Side Delivery Rake Parts Manual


John Deere 650 Side Delivery Rake Parts Manual


$28.95


Ford 305 Side Delivery Rake Spreader Parts Manual


Ford 305 Side Delivery Rake Spreader Parts Manual


$39.95


JOHN DEERE SIDE DELIVERY RAKE OPER MANUAL


JOHN DEERE SIDE DELIVERY RAKE OPER MANUAL


$4.99


McCormick Side Delivery Rake 4 bar Operators Manual


McCormick Side Delivery Rake 4 bar Operators Manual


$7.62


670, 671 Side-Delivery Rakes & Dual Hitch Operator's


670, 671 Side-Delivery Rakes & Dual Hitch Operator’s


$9.99


McCormick No. 10 Side Delivery Rake Operator's Manual


McCormick No. 10 Side Delivery Rake Operator’s Manual


$14.99


Massey-Harris No. 3 Side - Delivery Rake (right Hand)


Massey-Harris No. 3 Side – Delivery Rake (right Hand)


$3.99


Massey-Harris Left Hand Side - Delivery Rake  1923-1925


Massey-Harris Left Hand Side – Delivery Rake 1923-1925


$3.99


1957 OLIVER Parts Book For No.107 Side Delivery Rake Shelbyville IL


1957 OLIVER Parts Book For No.107 Side Delivery Rake Shelbyville IL


$12.25


JOHN DEERE VINTAGE 350 SERIES SIDE-DELIVERY RAKE  OPERATOR'S  MANUAL   jd


JOHN DEERE VINTAGE 350 SERIES SIDE-DELIVERY RAKE OPERATOR’S MANUAL jd


$14.95


JOHN DEERE VINTAGE 594 SERIES SIDE-DELIVERY RAKE  OPERATOR'S  MANUAL   jd


JOHN DEERE VINTAGE 594 SERIES SIDE-DELIVERY RAKE OPERATOR’S MANUAL jd


$14.95


JOHN DEERE VINTAGE 650 SERIES SIDE-DELIVERY RAKE  OPERATOR'S  MANUAL   jd


JOHN DEERE VINTAGE 650 SERIES SIDE-DELIVERY RAKE OPERATOR’S MANUAL jd


$14.95


Cockshutt


Cockshutt “4″ Side Delivery Rake Repair Parts List


$19.95


Ford SemiMounted Side Delivery Rake 508 Operator Manual


Ford SemiMounted Side Delivery Rake 508 Operator Manual


$15.95


VINTAGE JOHN DEERE OPERATORS- PARTS  MANUAL-# 851 SIDE DELIVERY RAKE


VINTAGE JOHN DEERE OPERATORS- PARTS MANUAL-# 851 SIDE DELIVERY RAKE


$13.49


MASSEY FERGUSON No 36 SIDE DELIVERY RAKE OWNERS OPERATORS MANUAL TEETH TINES


MASSEY FERGUSON No 36 SIDE DELIVERY RAKE OWNERS OPERATORS MANUAL TEETH TINES


$14.57

  1. No comments yet.
  1. No trackbacks yet.
You must be logged in to post a comment.